Ask experts in Malaysia

Kawasaki Gas Turbine Asia Sdn. Bhd.

High output and stable power can be secured while reducing costs From proposing solutions to on-site issues to maintenance in Malaysia.


It was 1999, 20 years ago. Kawasaki Gas Turbine Asia was established 20 years ago in 1999 as a sales and service base for Kawasaki's gas turbine power generation equipment in Asia. Today, Kawasaki Gas Turbine Asia has earned a good reputation from its customers, who say, "The system has been operating stably without any trouble or problems," and is steadily building relationships of trust with Japanese and local companies in Southeast Asia.
 

Point 1: Securing stable power supply while reducing costs

The cost of generating electricity in-house using various product lines developed, designed, and manufactured by the company is lower than that of operating a factory using electricity supplied by a local power company, and also ensures stable power supply.
 

Trusted and valued point 2: A wide range of options to meet your needs.

These include the Kawasaki Green Gas Engine, which achieves the world's highest level of power generation efficiency and environmental performance; the Gas Turbine, which can extract multiple types of secondary energy (electricity, steam, etc.), for example, by using exhaust heat in other production processes. Our product lineup is very rich, including "gas turbines" that can extract multiple types of secondary energy (electricity, steam, etc.), such as exhaust heat that can be used in other production processes, for example, to reduce the generation of nitrogen oxides and thus reduce environmental impact, and "large, simple, and small boilers" that are highly durable and achieve the industry's top efficiency.

As a result, we are able to respond to the following requests.
We want to introduce equipment that meets factory demand.
We want to achieve energy conservation by effectively using energy.
I want to operate flexibly in accordance with power demand.
We are also able to propose solutions that meet the needs and challenges of the workplace, such as what equipment is best suited for your company.
 

Trusted and valued point 3 - Complete after-sales service at our local overhaul factory

Our technical staff, who have been trained in Japan for a long period of time, are stationed at our company, and are highly reliable for on-site inspections, parts replacement and other maintenance work. We also have an overhaul plant in Malaysia, which enables us to quickly carry out the entire process of gas turbine disassembly, inspection, parts repair and replacement, assembly, and operational testing. We are the only company with an overhaul plant in Malaysia. We are the only company with an overhaul plant in Malaysia, so you can be sure to receive prompt, reliable, and thorough after-sales service.

Why don't you consider securing stable power while reducing costs with Kawasaki quality that can also address global environmental issues?


 



Company Name
Kawasaki Gas Turbine Asia Sdn. Bhd.
Address
No.12A, Jalan Tiang U8/92, Seksyen U8, Bukit Jelutong Industrial Park, 40150 Shah Alam, Selangor
Established
2005
Contact
TEL:03-7846-2882
Business
  • •Marketing, assembly, fabrication, installation and commissioning of Kawasaki gas turbine generator equipment
  • •Engineering of CHP (Combined Heat and Power) projects on a turnkey basis
  • •Construction overhaul and testing
  • •Maintenance, supply of spare parts
  • •Operation and maintenance guidance

Inquiry form

CONNECTION will connect you with an expert in Malaysia.
Please use the contact form below to get in touch with us.
 

Inquiry: Ask Experts in Malaysia